DINMACO CONSTRUCTION (UK) LIMITED
Civil/Structural Engineering Design & Construction
E: Ken.Orji@dinmaco.com T:07568084328, +(44)07901037856
Robotic Total Station
The Finished Floor Level will then be established to allow the necessary excavations to be made, so that the foundations can be put in place .
The cost of setting out for each project is determined based on the size and complexity of the design, and the time required for the on-site team to complete the setting out.
To discuss your project, or to arrange an obligation free site visit, please contact a member of the team.
Rotating Laser Levelling
Setting Out
Setting out is a crucial stage in every project, this is why here at Dinmaco adequate time is spent in ensuring everything is done accurately.
Drawings for every project are supplied by Dinmaco's design team, and these are used to accurately locate the plot on site.
Using a robotic total station, and a wooden peg and nail, the points of the centre line of your groundworks will be set out. This method provides a better tolerance for construction, and allows construction to be carried out exactly according to plan.